August 2009
Lisbon Subway network map
Author: ttlCategories: Lisbon map metropolitan transport Transports
20.08.2009

Working hours
Network operation
The opening and closing time of the Lisbon subway (Metropolitano de Lisboa) stations is the following:
- Opening: 06h 30m.
The first train leaves at 06h 30m from the terminal stations of each line. - Closing: 01h 00m.
The last train leaves at 01h 00m from the terminal stations of each line.
- Add new comment
-

St George's Castle (Castelo de São Jorge)
Author: ttlCategories: apartment castle center Culture Lisbon rental
10.08.2009

Located on one of the highest hills in Lisbon, a charming place near the river Tagus, the St George Castle (Castelo de São Jorge) stands on the riverside landscape of Lisbon's downtown.





